# Correction: provenance misstatement on the GTIG primary read

- **Artifact ID:** CHQ-CORR-2026-015
- **Version:** 1.0
- **Status:** IN FORCE
- **Public record:** https://record.cybersecurityhq.com/governance/chq-corr-2026-015
- **Machine-record SHA-256:** `9acb4972af28dc92eaa6197694bf2e4fd7e73c47763903dd7df9944bd03abbe4`

## Complete structured record

```json
{
  "id": "CHQ-CORR-2026-015",
  "title": "Correction: provenance misstatement on the GTIG primary read",
  "class": "CORRECTION",
  "version": "1.0",
  "effective": "2026-10-27",
  "published": "2026-10-27",
  "status": "IN FORCE",
  "status_detail": "RATIFIED 2026-10-27 by DM, PROCEDURAL. Scope: the four canonical field corrections (the primary-review provenance on SN-2026-10-13-01 and SN-2026-10-13-02 from 2026-10-13 to 2026-10-27; the withdrawn primary-read clause marked withdrawn in place on SN-2026-10-13-01; the CHQ-CATCHLAG-2026-003 descriptor separating the secondary review from the first verified primary review) and the preservation of their verbatim history. the first-screened provenance 2026-10-13 stands on both rows. The catch-lag breach is NOT rescored on the 49-day primary latency; that question is referred to the Q4 audit. No content, class, grade, count or Outlook changed anywhere in the record.",
  "rule": "Correction: provenance misstatement on the GTIG primary read",
  "scope": "The primary-review provenance on two held evidence rows asserted a review that had not taken place. Both rows were in fact admitted on secondary accounts at the lower evidence grade; the primary source was first read 49 days after its publication and confirms both rows exactly as recorded. No content, class, grade, count or Outlook changed anywhere in the record. The original values are preserved in this record. The control that contained the error was the evidence-grade rule; the provenance field itself is unchecked, and a field-level check on it is recorded as a candidate, not an implemented control. Whether the related catch-lag breach should be rescored on the longer primary latency rather than the latency it was scored on is referred to the Q4 audit.",
  "authority": "DM ratified 2026-10-27"
}
```
