# RATIFICATION RECORD — Record Correction and Governance Ratification

- **Artifact ID:** CHQ-RAT-2026-001
- **Version:** v1.0
- **Status:** RATIFIED
- **Public record:** https://record.cybersecurityhq.com/doctrine/chq-rat-2026-001
- **Machine-record SHA-256:** `0ee5b72b90c2e5b708d3662672a8319e53d9f91d4e664c9586816568749f4b5c`

## Complete structured record

```json
{
  "id": "CHQ-RAT-2026-001",
  "title": "RATIFICATION RECORD — Record Correction and Governance Ratification",
  "version": "v1.0",
  "issued": "2026-09-22",
  "status": "RATIFIED",
  "doctrine_class": "ISSUANCE_RULE",
  "doctrine_scope": "POSITIONS",
  "governed_artifacts": [
    "CHQ Position Record",
    "CHQ-PRS-2026-001"
  ],
  "related_doctrine": [
    "CHQ-PRS-2026-001",
    "CHQ-R-2026-001"
  ],
  "purpose": "Exact ratification instrument text, preserved as issued.",
  "sections": [
    {
      "heading": "CHQ-RAT-2026-001 — RATIFICATION RECORD",
      "content": "# CHQ-RAT-2026-001 — RATIFICATION RECORD\n\n**Instrument:** Record Correction and Governance Ratification\n**Ratified by:** DM\n**Ratification date:** 2026-09-22\n**Status:** RATIFIED\n\n---\n\n## AUTHORIZED SCOPE\n\nThis ratification authorizes five actions against the Position Record:\n\n**RAT-A. CHQ-P-2026-014.** Publish, or decouple by amending CHQ-P-2026-015 to remove the 014 pairing and the A-032 reference. Execution order: first, before any other action.\n\n**RAT-B. CHQ Position Record Standard (PRS) v1.0.** Create and enter into force as the governing layer above the Position Record.\n\n**RAT-C. CHQ-P-2026-007.** Withdraw to draft under PRS-12. Repair and reissue as v2.0 with Supersedes: v1.0.\n\n**RAT-D. Assumption Register.** Publish. Default publication state is reference only, outside reliance eligibility under CHQ-R-2026-001, until the register's states have held for one full cycle. Override available to DM at any time.\n\n**RAT-E. Corrective amendment wave.** Execute the change order CHQ_Position_Record_Change_Order_2026_09_22 as one dated event across all affected positions, following the 2026-07-24 wave precedent.\n\n---\n\n## BASIS\n\nChange order dated 2026-09-22, 85 changes across CHQ-P-2026-001 through 016, derived from comparison of exported PDFs against rendered pages at record.cybersecurityhq.com.\n\nPolicy direction dated 2026-09-22, thirteen calls, companion to the change order.\n\n---\n\n## RECORDED DISSENT\n\nThe analytical recommendation was to split this ratification in two, with a completeness gate between RAT-B and RAT-C, and to hold RAT-D outside reliance eligibility pending stability.\n\nDM ratified as a single instrument. The completeness gate is retained as execution step WAVE-2 rather than as a ratification gate. The reliance limitation on RAT-D is retained as a PRS default rather than as a ratification condition.\n\nRecorded under the principle that dissent against a ratified instrument is logged, not repeated.\n\n---\n\n## EXECUTION SEQUENCE\n\n| Step | Action | Depends on | State |\n|---|---|---|---|\n| RAT-A | Publish or decouple 014 | none | open |\n| RAT-B | PRS v1.0 in force | none | drafted |\n| WAVE-1 | Map all 85 changes to PRS provisions | RAT-B | open |\n| WAVE-2 | Completeness pass: any change not decided by a PRS provision is a gap in PRS | WAVE-1 | open |\n| RAT-C | Withdraw 007 | RAT-B | open |\n| RAT-D | Publish assumption register, reference only | RAT-B | open |\n| WAVE-3 | Execute amendments, recompute hashes, publish reconciliation note | WAVE-2, RAT-A | open |\n| WAVE-4 | Rebuild site from canonical PDFs | WAVE-3 | open |\n| RAT-C2 | Reissue 007 v2.0 | RAT-C | open |\n\n---\n\n## STANDING ITEMS NOT AUTHORIZED BY THIS INSTRUMENT\n\n- Ratification of the Operational Evidence primitive, open since CHQ-P-2026-010, March 2026.\n- Publication of any new position. Four candidates identified 2026-09-22, all held.\n- Promotion of the four-evidence-class claim currently resident in CHQ-P-2026-012 Context to an instrument of its own.",
      "type": "paragraph"
    },
    {
      "heading": "ESG TO PIG TRANSITION INSTRUMENT",
      "content": [
        "Instrument: CHQ-RAT-2026-001. Effective date: 2026-05-04.",
        "The Evidentiary Sufficiency Gate (CHQ-D-2026-ESG) remains the historical issuance gate for artifacts issued before the effective date. The Position Issuance Gate (CHQ-D-2026-PIG) applies to new Position issuance from 2026-05-04 forward.",
        "PIG adds Position-specific authority and adversarial-paragraph tests. A Position that passes PIG necessarily passes ESG; PIG does not erase or retroactively relabel ESG issuance.",
        "The fifteen Positions and nineteen evidence dockets issued under ESG before the effective date are grandfathered unchanged. Their identifiers, hashes, gate labels, reliance classifications, and locked canonical text remain valid as issued. No retroactive relabeling or docket rewrite is authorized.",
        "Public rendering uses the gate recorded by each artifact at issuance. Existing ESG artifacts remain ESG; new Position artifacts may identify PIG as their issuance gate while retaining the historical ESG relationship."
      ],
      "type": "paragraph"
    }
  ]
}
```
